Select and confirm
Choose the model, options, property location, intended use, and project requirements.
STEP BY STEP ORDER PROCESS
Follow the CHC order process from model selection and written quotation through customization, production, inspection, international transport and final delivery.
STEP BY STEP ORDER PROCESS
POINTS TO REVIEW
Connect model selection, quotation, deposit, customization, production, inspection, transport, customs, and delivery.
Choose the model, options, property location, intended use, and project requirements.
Review the written quotation, deposit requirements, payment stages, and included services.
Confirm specifications, manufacturing updates, quality checks, and shipping preparation.
Coordinate sea transport, customs, ground transportation, unloading, and installation.
PREPARE THE RIGHT QUESTIONS
BEFORE MOVING FORWARD
The exact answers depend on the property, municipality, model, and professionals involved.
Are the model and options confirmed in writing?
Which costs and services are included?
When are inspections and payment milestones completed?
Is the property ready before delivery?
Ordering a prefabricated container house involves more than selecting a model and arranging transportation. The property, municipality, quotation, customization, production, documentation and final delivery all need to be coordinated. The exact sequence can vary by project, but the following steps provide a practical framework.
Before finalizing a model, confirm the delivery location and how the building will be used. Contact the municipality to understand zoning, permits, setbacks, foundation and servicing requirements. This information can affect the size and configuration you should order.
Compare the published CHC container-house collections and identify the size, layout and options that fit the project. If you need customization, describe it before the quotation is finalized so the scope can be reviewed.
The quotation should identify the selected model, options, pricing, included services, payment requirements and the delivery assumptions known at that stage. Use the written quotation—not generic website text—to confirm the commercial terms for the actual order.
Deposit percentages and payment milestones can vary by order. Follow the terms shown on the quotation or purchase documents. Keep payment confirmations and project records together for easy reference.
Once the order is released for production, the factory prepares the unit according to the approved configuration. Changes requested after production has started may affect cost or timing, so confirm important selections as early as possible.
Before international transport, the unit is prepared for shipment and the required order and logistics information is coordinated. Review Preparation and Transport for the main shipping stages.
Vessel schedules, weather, port operations and customs can affect the timeline. Shipment information should be monitored as the unit moves toward Canada. See the Canadian Customs guide for planning considerations.
Before the delivery vehicle reaches the property, make sure the route, unloading area, foundation and required equipment are ready. The On Site Delivery guide explains what to check.
If you already know the model or approximate size, province, municipality, intended use and desired timing, submit those details through the Our Services page. The more complete the project information is, the easier it is to prepare an accurate quotation and delivery plan.
RELATED NEXT STEPS
Find collections that fit the confirmed requirements.
Explore Our Models →See how we coordinate the product, documentation, and logistics.
View Our Services →Plan property access, unloading, and installation requirements.
View Delivery Details →READY FOR A MORE PRECISE CONVERSATION
Include the model, province, municipality, intended use, and timeline.